Reporting Requirements for Public Projects as per HB13-1292

Image of woman working on HVAC

CCCS is posting solicitation IFB 21-002 HVAC Upgrades and Roof Replacement as a Design/Bid/Build (D/B/B) project.  D/B/B is an effective method of delivering a project of this scope and scale. The advantage of DBB method is the complete scope of work at bid time and accurate pricing before construction begins. Given the Budget, Scope, and Schedule of the project it made sense to choose DBB over Construction Manager/General Contractor or Guaranteed Maximum Price.